BMW X5 M Sticky Header Image
BMW X5 M
X5 M Competition
BL73FCU
7,502 miles
£91,500
LP £1,100 month
Click & collect
Reserve online and collect in store
Reserve & test drive
Visit our showroom today
UK nationwide delivery
Available on all cars
VAT Qualifying
Just arrived
BMW X5 M Image 1BMW X5 M Image 2BMW X5 M Image 3BMW X5 M Image 4BMW X5 M Image 5BMW X5 M Image 6BMW X5 M Image 7BMW X5 M Image 8BMW X5 M Image 9BMW X5 M Image 10BMW X5 M Image 11BMW X5 M Image 12BMW X5 M Image 13BMW X5 M Image 14BMW X5 M Image 15BMW X5 M Image 16BMW X5 M Image 17BMW X5 M Image 18BMW X5 M Image 19BMW X5 M Image 20BMW X5 M Image 21BMW X5 M Image 22BMW X5 M Image 23BMW X5 M Image 24BMW X5 M Image 25BMW X5 M Image 26BMW X5 M Image 27BMW X5 M Image 28BMW X5 M Image 29

Overview

ID: 18500

X5 M Competition

21"-22" M BLACK ALLOYS, SKY LOUNGE PANORAMIC GLASS SUNROOF, HARMAN / KARDON, COMFORT PLUS PACKAGE, PRIVACY, RED CALIPERS, DIGITAL COCKPIT

Brooklyn Grey with Full Sakhir Orange with Black Leather Interior Trim

This car benefits from the following features: Climate Controlled Front Seats, 90 Ah AGM Battery.
Year
2023
Reg
BL73FCU
Mileage
7,502
Colour
Brooklyn grau metallic
Body type
Large SUV
Transmission
Automatic
Fuel type
Petrol Hybrid
Engine size
4395 cc
Doors
5
Seats
5
MPG

The fuel consumption and CO2 emission figures shown above are measured at the point the vehicle was new. Figures are intended for comparability purposes. The fuel consumption you achieve under real life driving conditions and CO2 produced will depend upon a number of factors including the accessories fitted after registration, variations in driving styles, weather conditions, vehicle age and vehicle load.

21.90
Emissions

The fuel consumption and CO2 emission figures shown above are measured at the point the vehicle was new. Figures are intended for comparability purposes. The fuel consumption you achieve under real life driving conditions and CO2 produced will depend upon a number of factors including the accessories fitted after registration, variations in driving styles, weather conditions, vehicle age and vehicle load.

293.00 G/KM

This vehicle's specification has been provided by industry leading data suppliers CAP HPI and Autotrader, which provides vehicle data across the whole of the market. However, we cannot guarantee the accuracy of any data provided by 3rd Party sources as the specification can sometimes vary. Please check with a salesperson and ensure you physically inspect the vehicle in respect of any items which may affect your decision to purchase.

Standard specification

  • 32GB hard disc drive (HDD) memory
  • Attentiveness assist
  • Automatic tailgate with seperately opening top hinged section
  • BMW ConnectedDrive online services
  • BMW Drive recorder
  • BMW gesture control
  • BMW legal emergency call
  • BMW Live Cockpit Pro with Head up display including 12.3" instrument display and 14.9" high resolution control display with navigation function
  • BMW Recovery system
  • BMW Teleservices
  • Brake force display
  • Brake pad wear indicator warning light
  • Condition based service - BMW service history, electronic service booklet, integrated owner's handbook
  • Electric power steering
  • Enhanced bluetooth hands free facility with Telephony wireless charging
  • Front/rear park distance control (PDC)
  • iDrive controller with shortcut buttons
  • Infinity symbol with line graphic on reset of average consumption
  • Language version English
  • M drive buttons
  • M servotronic
  • Oil sensor for level and grade
  • On board computer inc. average speed, fuel consumption, liquid crystal Info display, journey computer, outside temperature display, personal profile
  • Recovery braking system
  • Run flat indicator
  • Service interval indicator
  • Stop/start button
  • Storage for wireless charging
  • Wi-Fi hotspot
  • 8 speed automatic with steptronic transmission including launch control and gearshift paddles on the steering wheel
  • Active M differential
  • BMW M TwinPowerTurbo 8 cylinder petrol engine
  • Double VANOS
  • High precision injection
  • M Adaptive suspension pro
  • M Sport differential
  • M xDrive system
  • Petrol Particulate Filter
  • Safety battery terminal clamp
  • Turbocharger with Valvetronic
  • BMW Personal eSim
  • DAB Tuner enables digital radio reception
  • Favourite buttons
  • USB connection, USB type A 1.5A in cupholder, USB Type C 3A in centre armrest
  • Adaptive LED Headlights
  • High beam assistant
  • LED fog lights
  • Automatically dimming rear view mirror
  • BMW Individual high gloss shadow line exterior trim
  • BMW Individual high gloss shadow line with extended contents
  • BMW individual lights shadow line
  • Body color M rear spoiler
  • Body colour bumpers
  • Body colour door handles
  • Body colour roof spoiler
  • Brake lights illuminate under normal braking
  • Door locking - after driving off to secure vehicle
  • Dynamic brake lights with LED technology
  • Exterior mirror base in black matt
  • Follow me home headlight function
  • Front and rear bumper system
  • Front and rear door sill strips
  • Front and rear electric windows with open and close fingertip control, anti trap facility and comfort closing
  • Heated windscreen washer jets
  • High gloss black shadow line roof rails
  • Integrated direction indicators
  • LED daytime running lights
  • LED Rear light with tail light, brake light and turn indicators
  • LED Reflectors, left and right, integrated in tailgate
  • M Sport exhaust system
  • M strake element with model designation, integrated in the Air Breather
  • M-specific Exterior mirrors
  • Rain sensor with automatic headlight activation and windscreen wiper control
  • Rear side wing doors
  • Rear wiper
  • Roller shutter
  • Sun protection glazing
  • Third brake light in rear spoiler
  • Trailer stabilisation logic
  • Under severe vehicle deceleration
  • Variable intermittent rear wash/wipe
  • Welcome light carpet
  • X5 M competition badging on tailgate high gloss black right finished
  • 12V - Power sockets with 2x centre console and 1x luggage compartment
  • 4 Lashing eyes in boot
  • 4 zone control automatic air conditioning
  • 40:20:40 split folding rear seats
  • BMW ID
  • Child seat ISOFIX attachment with rear outer seats includes top tether
  • Compartment in front of cupholder
  • Driver + front passenger lumbar support
  • Electric adjustment of the upper section of the backrest with Illuminated M logo on the head restraint
  • Electrical steering column with adjustable height and length with activation and control on the steering column
  • Front and rear cupholders x 2
  • Front and rear door pockets
  • Front and rear side armrest integrated into door trim
  • Front reading lights
  • Gear selector lever and operation
  • Left and right bag hooks in luggage compartment
  • Light inside glove compartment
  • Lockable glove compartment
  • Luggage compartment floor panel with integral storage tray
  • Luggage compartment lighting
  • Luggage net
  • Lumbar support with height and depth adjustment in backrest
  • M Electric front sport seats with memory function
  • M sport leather steering wheel
  • M steering wheel with gearshift paddle switches made of CFC
  • Multifunction controls for leather steering wheel
  • Multifunctional hooks
  • Seat back with flap pocket
  • Securing rings in luggage compartment
  • Storage bins on all doors
  • Storage space underneath the floor insert in luggage compartment
  • Storage tray and compartment with cover in centre console
  • Sunvisors with illuminated vanity mirrors
  • Toolkit located in luggage compartment
  • Vanity mirror lights
  • Velour floormats
  • Leather dashboard
  • 3 rear headrests
  • 3 seat bench in 2nd row
  • Single front passenger seat
  • Ambient light interior pack - X5 M/ X6M
  • Connected Package Professional - X5 M
  • Driving Assistant Professional Pack - X5 M
  • Expanded exterior mirror pack - X5 M/X6 M
  • Parking Assistant Professional Pack - X5M&X6M
  • Anti-lock braking system (ABS)
  • Automatic Stability Control (ASC)
  • Black M sports seatbelts with coloured M seam for all seats
  • Brake drying
  • Brake energy regeneration
  • Brake fade compensation
  • Braking pre-tensioning
  • Child proof locking system in rear door
  • CBC - (Cornering brake control)
  • Crash sensor activating central locking release, hazard warning lights, fuel cut off, interior lighting + activation of safety battery terminal clamp
  • Deformation zones - front and rear with door reinforcements and bumpers up to 2.5 mph
  • Driver and front passenger airbags
  • Driver and front passenger side airbag
  • DSC - Dynamic Stability Control
  • Dynamic brake control
  • Dynamic Traction Control - DTC
  • Electromechanical parking brake with automatic drive away release and auto hold function
  • Electronic brake force distribution
  • Front and rear brake discs with interior ventilation
  • Front and rear head airbags
  • Front and rear M seatbelts stopper, seatbelt tensioner for front and outer rear seats and belt force limiter
  • Front head restraints with anti-whiplash
  • Height adjustable front seatbelts
  • High-performance disc brake with compound structure
  • Hill start assistant
  • Integrated brake system
  • Mechanical child proof lock on rear doors
  • Passive protection for pedestrians
  • PC iBrake (Post crash approach control warning with light braking function)
  • Seat occupancy detection for driver and passenger side
  • Side impact protection
  • Three 3 point inertia reel seatbelts
  • Two tone horn
  • Tyre pressure indicator
  • Warning triangle and first aid kit
  • Alarm system
  • Closing system with central locking
  • Comfort Access with Keyless access to the vehicle through all doors and tailgate, BMW Digital Key Plus for locking/unlocking
  • Driver and front passenger door centre lock switch
  • Locking wheel bolts
  • Vehicle key
  • BMW Individual leather finished instrument panel
  • Tyre repair kit

This vehicle's specification has been provided by industry leading data suppliers CAP HPI and Autotrader, which provides vehicle data across the whole of the market. However, we cannot guarantee the accuracy of any data provided by 3rd Party sources as the specification can sometimes vary. Please check with a salesperson and ensure you physically inspect the vehicle in respect of any items which may affect your decision to purchase.

Tech specification

HC+NOxNot Available
ParticlesNot Available
Standard Euro EmissionsEURO 6
WLTP - CO2 (g/km) - Comb289
WLTP - CO2 (g/km) - Comb - TEH292
WLTP - CO2 (g/km) - Comb - TEL289
WLTP - CO2 (g/km) - Extra High267
WLTP - CO2 (g/km) - High247
WLTP - CO2 (g/km) - Low466
WLTP - CO2 (g/km) - Medium276
NCAP Overall Rating - LCV0.6
Alternative Fuel QualifyingYes
Badge Engine CC4.4
Badge Power625
Based On IDNot Available
Coin DescriptionxDrive
Coin SeriesX5 M Competition
Generation Mark4
Insurance Group 1 - 50 Effective January 0750E
Manufacturers Corrosion Perforation Guarantee - Years12
Manufacturers Paintwork Guarantee - Years3
NCAP Adult Occupant Protection %Not Available
NCAP Child Occupant Protection %Not Available
NCAP Overall Rating - Effective February 09Not Available
NCAP Pedestrian Protection %Not Available
NCAP Safety Assist %Not Available
Did at least one aspect of this vehicle's safety give cause for concern?No
Special EditionNo
Special OrderNo
Standard manufacturers warranty - MileageUnlimited
Standard manufacturers warranty - Years3
Vehicle Homologation ClassM1
In-Life Emissions - CO2e (Equivalent) - tonnes11.1
Lifetime Emissions - CO2e (Equivalent) - tonnes26.3
Production Emissions - CO2e (Equivalent) - tonnes14.6
CamshaftDOHC
Catalytic ConvertorYes
CC4395
Compression Ratio10.5:1
Cylinder LayoutV8
Cylinders8
Cylinders - Bore (mm)89
Cylinders - Stroke (mm)88.3
Engine CodeS68B44T0
Engine LayoutNORTH SOUTH
Fuel DeliveryTWIN TURBO
Gears8 SPEED
Number of Valves32
TransmissionSEMI-AUTO
EC Directive 1999/100/EC AppliesNo
WLTP - FC (l/100km) - Comb12.8
WLTP - FC (l/100km) - Comb - TEH12.9
WLTP - FC (l/100km) - Comb - TEL12.8
WLTP - FC (l/100km) - Extra High11.8
WLTP - FC (l/100km) - High10.9
WLTP - FC (l/100km) - Low20.6
WLTP - FC (l/100km) - Medium12.2
WLTP - MPG - Comb22.1
WLTP - MPG - Comb - TEH21.9
WLTP - MPG - Comb - TEL22.1
WLTP - MPG - Extra High23.9
WLTP - MPG - High25.9
WLTP - MPG - Low13.7
WLTP - MPG - Medium23.2
0 to 62 mph (secs)3.9
Engine Power - BHP625
Engine Power - KW460
Engine Power - RPM6000
Engine Torque - LBS.FT553
Engine Torque - MKG76.5
Engine Torque - NM750
Engine Torque - RPM1800
Top Speed155
Emissions Test CycleWLTP
RDE Certification LevelRDE 2
Alloys?Yes
Space Saver?No
Tyre Size Front295/35 R21
Tyre Size Rear315/30 R22
Tyre Size SpareTYRE REPAIR KIT
Wheel StyleSTYLE 818M
Wheel Type22" ALLOY
Height1762
Height (including roof rails)Not Available
Length4948
Wheelbase2972
Width2015
Width (including mirrors)2218
Fuel Tank Capacity (Litres)83
Gross Vehicle Weight3040
Luggage Capacity (Seats Down)1870
Luggage Capacity (Seats Up)650
Max. Loading Weight640
Max. Roof Load100
Max. Towing Weight - Braked2700
Max. Towing Weight - Unbraked750
Minimum Kerbweight2400
No. of Seats5
Turning Circle - Kerb to Kerb12.8

This vehicle's specification has been provided by industry leading data suppliers CAP HPI and Autotrader, which provides vehicle data across the whole of the market. However, we cannot guarantee the accuracy of any data provided by 3rd Party sources as the specification can sometimes vary. Please check with a salesperson and ensure you physically inspect the vehicle in respect of any items which may affect your decision to purchase.

2023 BMW X5 M
X5 M Competition

21"-22" M BLACK ALLOYS, SKY LOUNGE PANORAMIC GLASS SUNROOF, HARMAN / KARDON, COMFORT PLUS PACKAGE, PRIVACY, RED CALIPERS, DIGITAL COCKPIT
Brooklyn Grey with Full Sakhir Orange with Black Leather Interior Trim
Inc. £3,240 of fitted extras
Pay monthly
£1,100
Pay in full
£91,500
+Admin Fee

A variable administration fee is charged depending on your circumstances.

  • Repeat retail customers purchasing within 12 months FREE
  • Repeat retail customer purchasing within a 13-24 month period £199
  • Retail Customer £299
  • Export Sale £995 (Plus VAT) (In addition to fees above)

For full retail terms and conditions please click here

  • Trade Sale to the motoring trade or Export Sale the Fee is £995 (Plus VAT)

For full trade terms and conditions please click here

View finance options

BMW X5 M

Enquire now
By submitting this form I agree to the terms of our Terms & Conditions and Privacy Policy
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Book a test drive

BMW X5 M
  • Just arrived

BMW X5 M

2023, X5 M Competition
£91,500 or £1,100 per month
Standard booking fee: Free
Secure booking fee: £500.00
  • Instantly book

    Select a suitable date and time to inspect and test drive this vehicle at your leisure.

  • Peace of mind

    All of our cars have gone through a 200 + multi point vehicle inspection and vehicle provenance check for peace of mind

  • No obligation

    There’s no obligation to go ahead. No ifs, no buts. Just come for a visit and we know we'll wow you

  • Not secured

    This does not stop another customer from snapping this car before you get the chance. Want to secure it? Click the secure booking button below and secure it for with a fully refundable £99 deposit

By submitting this form I agree to the terms of our Privacy Policy
Standard test drive
Booking a test drive does not stop another customer from snapping up this car before you get a chance. Want to make sure you don't lose out? Click the 'Secure Booking' button below and secure it with fully refundable £500 deposit.
Secure booking £500
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

BMW X5 M

Request personalised video
By requesting video you agree to our Terms & Conditions and Privacy Policy
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.
Have a part-exchange?
Looking for finance?
Free Credit Check Check for free whether you’re likely to be accepted for finance, without it affecting your credit rating.
Apply for Finance Once finance accepted progress with confidence, knowing funds are in place for your purchase.
Print advert
Protect your car with Saxton Car Care
View more

Vehicle Options

£3,240
Worth of factory fitted options have been fitted to this BMW X5 M
£126,590 total list price, when new
£35,090 savings from new

Fitted optional extras

  • Sky Lounge panoramic glass sunroof
    £2,650
    Tilting sliding glass electric front to rear sunroof with sunshade and one-touch opening, Ambient lighting
  • Sun protection glazing
    £420
    Privacy glass on the rear window and on the rear side windows
  • Luggage-compartment separating net
    £170
    Load restraint net

This vehicle's specification has been provided by industry leading data suppliers CAP HPI and Autotrader, which provides vehicle data across the whole of the market. However, we cannot guarantee the accuracy of any data provided by 3rd Party sources as the specification can sometimes vary. Please check with a salesperson and ensure you physically inspect the vehicle in respect of any items which may affect your decision to purchase.

Finance calculator

Card Icon Saxton Car Care

Learn about our protection packages

Why buy from Saxton?

Quality Assured Icon

Quality Assured

Not only are our cars thoroughly checked and reconditioned, but each one has had a recent service and MOT (if required)

More Information

Budget Friendly Finance Icon

Budget Friendly Finance

We're able to offer a full range of finance options and bespoke packages tailored to suit your budget

View Finance Options

Car Care Icon

Car Care

Every car comes with a free RAC warranty and RAC roadside assistance, with options available up to 5 years. 

View full Care Packages

Recently Viewed

Location

Saxton 4x4
Westway
Chelmsford
Essex
CM1 3BH

Opening times

4.1 (3,000+ reviews)
4.6 (8,000+ reviews)
4 (250+ reviews)