
Overview
The fuel consumption and CO2 emission figures shown above are measured at the point the vehicle was new. Figures are intended for comparability purposes. The fuel consumption you achieve under real life driving conditions and CO2 produced will depend upon a number of factors including the accessories fitted after registration, variations in driving styles, weather conditions, vehicle age and vehicle load.
The fuel consumption and CO2 emission figures shown above are measured at the point the vehicle was new. Figures are intended for comparability purposes. The fuel consumption you achieve under real life driving conditions and CO2 produced will depend upon a number of factors including the accessories fitted after registration, variations in driving styles, weather conditions, vehicle age and vehicle load.
ID: 17913
X3 M Competition
21" ALLOYS, SLIDING PANORAMIC ROOF, TECHNOLOGY PLUS PACK, HUD, HARMAN / KARDON, DRIVE RECORDER, PARKING ASSISTANT PLUS, M COMPOUND BRAKES WITH RED HIGH GLOSS, DIGITAL COCKPIT, PRIVACY
Sapphire Black with Full Black-Midrand Beige Leather Interior Trim
This car benefits from the following features: 90 Ah AGM Battery.This vehicle's specification has been provided by industry leading data suppliers CAP HPI and Autotrader, which provides vehicle data across the whole of the market. However, we cannot guarantee the accuracy of any data provided by 3rd Party sources as the specification can sometimes vary. Please check with a salesperson and ensure you physically inspect the vehicle in respect of any items which may affect your decision to purchase.
Standard specification
- Active Guard
- Attentiveness assist
- Auto start-stop
- Automatic tailgate operation
- BMW ConnectedDrive online services
- BMW gesture control
- BMW Live Cockpit Professional Nav with 12.3" instrument display + 12.3" control display, Intelligent Voice Assist, BMW OS 7, HDD, 2USB, 4G LTE connect
- BMW service history
- BMW Teleservices
- Brake pad wear indicator in front and rear
- Check Control warning system for monitoring of lights and door/luggage compartment open warning
- Condition based service
- Cruise control with brake function + speed limiter
- Electronic Power Steering (EPS)
- Enhanced bluetooth with wireless charging
- Front/rear park distance control (PDC)
- Head up Display
- iDrive Controller with 8 favourite buttons
- Integrated owner's handbook
- Language version English
- Lights on warning by audio warning signal when ignition is switched off
- M drive buttons
- Oil sensor for level and grade, warning by check control system
- On board computer - average speed+fuel consumption, service interval, clock/date, odometer/trip meter, outside temperature display and ice warning
- Personal Profile - automatic lock when driving away selectable
- Run flat indicator
- Shifting point display
- Variable sport steering
- Wifi hotspot preparation
- Activation of safety battery terminal clamp
- Adaptive M suspension
- Double joint spring strut front axle
- Driving experience modes - Comfort,ECO PRO,Sport and Sport+ mode
- Eight speed M Steptronic sport transmission with drivelogic and gearshift paddle switches on steering wheel
- Electronic differential lock
- EU6 emissions management
- Incorrect fuelling protection
- M Sport differential
- Performance Control
- 2x USB Type C ports in front centre console for charging and data transfer
- DAB tuner
- Electronic service booklet
- Harman Kardon loudspeaker system
- Acoustic glazing
- Auto dimming with folding wing mirrors
- Automatic headlight beam throw control with load dependent regulating reaction, dynamic compensation of braking dive and acceleration squat
- Body colour door handles
- Body colour front and rear bumpers
- Body colour spoiler
- Direction indicator, side repeaters, integrated in exterior mirrors
- Electric front and rear windows with fingertip open/close + anti-trap facility and comfort closing function
- Electrically adjustable and heated door mirrors
- Follow me home headlight function
- Front and rear bumper system with replaceable deformation elements
- Green tinted heat protection glazing
- Heated rear window
- Heated windscreen washer jets
- High gloss black shadow line roof rails
- High gloss shadowline exterior trim in decorative moulding side frame/recess cover/guide rail/B, C pillars/mirror frame and triangle with mirror base
- High level 3rd brake light incorporating LED Technology
- Interior rear view electrochromatic mirror with automatic anti dazzle function
- Lightweight engineering
- M Competition bodystyling
- M door entry sills
- M Double slat kidney grilles in High Gloss Black with black slats
- M Exhaust tailpipes - Quad, round, split left and right with high gloss black finisher 100mm
- M Sport exhaust system
- Model inscription logo on right tailgate
- Rain sensor including auto headlights activation
- Rear side wing doors
- Rear wiper
- Reversing lights
- Shark fin antenna
- Sun protection glass
- Visible VIN plate
- Windscreen wipers with adjustable interval
- Dynamic brake lights
- High beam assistant
- LED tail lights
- Welcome lighting
- 12V power socket in luggage compartment and front centre console
- 2 USB ports for charging in rear of centre console
- 3 zone automatic air conditioning
- 40/20/40 split folding rear seats with backrest
- Anthracite headlining
- Battery in luggage compartment
- Electric seat adjustment with memory
- Floor mats in velour - Front and rear colour co-ordinated with all standard carpet colours and front with M stripes
- Foldable boot floor with storage compartment
- Four grab handles integrated in roof lining
- Four-way electrically adjustable front lumbar support
- Front and rear bottle holders integrated into door trim storage compartments
- Front and rear side armrests integrated into door trim
- Front centre armrest with storage compartment
- Front cupholders x 2
- Front M sport seats with electrically adjustable headrests and illuminated M logo in headrests
- Glove compartment with illumination
- Heated front and rear seats
- High gloss black front door sill finishers with X3 M competition designation
- Luggage compartment lighting
- M Gear knob
- M sport leather steering wheel
- Microfilter and active carbon filter
- Multifunction steering wheel
- Parcel shelf removeable and storable under boot floor
- Reach and rake adjustable steering column
- Rear seat centre armrest with two cupholders
- Seat backrest adjustment for rear seat
- Steering wheel heating
- Storage compartment in rear centre console, front and rear door trims and under luggage compartment
- Sunvisors with illuminated vanity mirrors and ticket pocket
- Through loading system with 40/20/40 split folding rear seat
- Toolkit located in luggage compartment
- Front head restraints
- Single front passenger seat
- Three rear headrests
- Ambient light pack - X3/X4 M
- Connected package professional - X3 M/X4 M
- Extended storage pack with Stainless steel door sills- X3 M
- Interior and exterior pack - X3/X4 M
- Interior lighting pack -X3/X4 M
- Active protection
- ADB - Automatic Differential Brake
- Airbags - Front driver/passenger, front and rear curtain head protection, front side, manual deactivation of front passenger airbag
- Anti lock braking system (ABS) with brake assist
- Automatic Stability Control (ASC)
- BMW emergency call
- Brake drying
- Brake energy regeneration
- Braking pre-tensioning
- CBC - (Cornering brake control)
- Child proof locking system in rear door
- Child seat ISOFIX attachment rear outer seats
- Compound structure brake discs
- Crash Sensor - activation of airbags
- Crash Sensor - activation of central locking release, hazard warning light and interior lighting
- Deactivation of fuel pump in the event of a crash
- Driver and front passenger with seat occupancy detection for driver's and passenger side
- Dynamic brake control
- Dynamic stability control + (DSC+)
- Dynamic Traction Control - DTC
- Electromechanical parking brake including automatic hold function and automatic release of the parking brake when driving off
- Hill descent control
- Hill start assist
- Passive protection for pedestrians
- Side impact protection
- Three point seatbelts to all seats with front and outer rear pyrotechnic belt tensioners and seat belt force limiters
- Twin horns
- Tyre pressure monitoring system
- Warning triangle and first aid kit
- Alarm system
- Central locking switch for all doors, fuel filler cap and luggage compartment
- Comfort access system with smart opener includes touch free opening bootlid and door handle illumination
- Electronic engine immobiliser
- Remote control with 2 integrated key with M specific design - 1 button open/close all lockable, windows + separate button for open luggage compartment
- Start/stop button with keyless motor start with acoustic drive feedback and stop/stop button in blue
- Carbon fibre interior trim finishers
- Sensatec dashboard in black with contrasting seam in grey and upper door trim panels in Sensatec for front and rear doors
- Tyre repair kit
This vehicle's specification has been provided by industry leading data suppliers CAP HPI and Autotrader, which provides vehicle data across the whole of the market. However, we cannot guarantee the accuracy of any data provided by 3rd Party sources as the specification can sometimes vary. Please check with a salesperson and ensure you physically inspect the vehicle in respect of any items which may affect your decision to purchase.
Tech specification
This vehicle's specification has been provided by industry leading data suppliers CAP HPI and Autotrader, which provides vehicle data across the whole of the market. However, we cannot guarantee the accuracy of any data provided by 3rd Party sources as the specification can sometimes vary. Please check with a salesperson and ensure you physically inspect the vehicle in respect of any items which may affect your decision to purchase.
Vehicle Options
£30,155 savings from new
Fitted optional extras
- Panoramic glass sunroof£1,310Tilting sliding glass electric front sunroof with sunshade and one-touch opening, Glass roof
- Merino leather/Alcantara upholstery£800Seat upholstery: synthetic suede and leather
- Interior trim, Carbon Fibre£600Carbon fibre trim on dashboard, carbon fibre trim on doors and carbon fibre trim on centre console
- Parking Assistant Plus£550360 view camera, Front sensor & camera-type parking distance system, side camera-type parking distance system
- Sun Protection Glass£350Privacy glass on the rear window and on the rear side windows
- Lumbar support, driver£290Driver seat: electrically adjustable, two electrical adjustments
- Heated seats, front and rear£280Rear seats: heated
- BMW Gesture Control£190Facial/gesture control
- Extended storage£19012v power outlet located in rear section, Connections for USB (rear), Seat back storage: pockets behind front seats, Load restraint sliding anchorage points
This vehicle's specification has been provided by industry leading data suppliers CAP HPI and Autotrader, which provides vehicle data across the whole of the market. However, we cannot guarantee the accuracy of any data provided by 3rd Party sources as the specification can sometimes vary. Please check with a salesperson and ensure you physically inspect the vehicle in respect of any items which may affect your decision to purchase.
Your Savings
£30,155 savings from new
Finance calculator
Saxton Car Care
Why buy from Saxton?

Quality Assured
Not only are our cars thoroughly checked and reconditioned, but each one has had a recent service and MOT (if required)
More Information

Budget Friendly Finance
We're able to offer a full range of finance options and bespoke packages tailored to suit your budget
View Finance Options

Car Care
Every car comes with a free RAC warranty and RAC roadside assistance, with options available up to 5 years.
View full Care Packages
You may also like
Recently Viewed


