
Overview
ID: 18295
M4 Competition Coupe
19S, HARMAN KARDON, TECH PLUS PLACK, PARK ASSIST PLUS, RED CALIPERS, PRIVACY
Dravit Grey Metallic with merino/silverstone/black Leather Interior
The fuel consumption and CO2 emission figures shown above are measured at the point the vehicle was new. Figures are intended for comparability purposes. The fuel consumption you achieve under real life driving conditions and CO2 produced will depend upon a number of factors including the accessories fitted after registration, variations in driving styles, weather conditions, vehicle age and vehicle load.
The fuel consumption and CO2 emission figures shown above are measured at the point the vehicle was new. Figures are intended for comparability purposes. The fuel consumption you achieve under real life driving conditions and CO2 produced will depend upon a number of factors including the accessories fitted after registration, variations in driving styles, weather conditions, vehicle age and vehicle load.
Standard specification
- Active guard plus
- Automatic start/stop system
- BMW ConnectedDrive online services
- BMW legal emergency call
- BMW Live Cockpit Pro with Head up display including 12.3" instrument display and 14.9" high resolution control display with navigation function
- BMW Teleservices
- Brake pad wear indicator warning light
- Condition based service
- Door/boot open warning light
- Driving experience switch
- Electric Power Steering (EPS) with Servotronic
- iDrive controller on centre console
- Instrument cluster with extended contents
- Language version English
- Lights on warning
- M drive buttons
- Oil sensor for level and grade, warning by check control system
- Oil temperature gauge
- On board computer
- On board diagnostics
- Optimum shift indicator
- Outside temperature display
- Park distance control
- Pull away assistant
- Run flat indicator
- Service interval indicator
- Shifting point display
- Speed limiter
- Start/stop button in blue
- Variable sport steering
- Adaptive M Sport suspension
- Double joint spring strut front axle
- M Drive Professional including track mode, laptimer, traction control & Drift analyser
- M Sport differential
- M steptronic sport transmission with drivelogic
- Safety battery terminal clamp
- 8 programmable favourite buttons
- Auxiliary point for auxiliary devices
- BMW professional radio/CD/MP3
- DAB Digital radio
- Harman/Kardon loudspeaker system
- Wireless charging tray
- Acoustic laminated side glass
- Auto dimming driver's door mirror
- Automatic headlights + automatic windscreen wipers
- Black chrome exhaust tailpipes
- Black model designation badges
- BMW high gloss shadow line with extended contents
- BMW Individual shadowline lights
- Body colour bumpers
- Body colour door handles
- Carbon fibre reinforced plastic (CFRP) roof
- Day running lights
- Door sill finishers with aluminium inserts
- Front and rear bumper system
- Front electric windows with open and close fingertip control, anti trap facility and comfort closing
- Headlight beam throw control
- Heat protection, sun protection glazing
- Heated washer jets
- High gloss black frameless kidney grille with M badge
- LED number plate light
- LED tail lights with 3D L-shaped LED light design
- M designation
- Mirror glass aspheric on driver's side, convex on passenger side
- Rain sensor
- Rear boot
- Rear fog lights
- Rear reflectors
- Reversing light
- Shark fin roof aerial
- Visible VIN plate
- Auto dimming rear view mirror
- Door mirror integrated indicators
- Electric adjustable heated door mirrors
- Electric folding door mirrors
- Dynamic brake lights
- Follow me home headlights
- High beam assistant
- Third brake light
- Welcome lighting
- 2 cupholders in front centre console
- 2 cupholders in rear armrest
- 2 x 12 V Power sockets (luggage compartment and front centre console)
- 2 x USB Type C ports for charging and data transmission in front centre console
- 40:20:40 split folding rear 2 seat bench with loading system
- Ambient lighting
- Anthracite headlining
- Battery in luggage compartment
- Carbon fibre centre console incl. cover for cupholders and storage compartment
- Carbon fibre decorative steering wheel finishers
- Carbon fibre shift paddles
- Carbon fibre strip in instrument panel on front passenger side
- Centre console armrest with storage compartment
- Compartment in front of cupholder
- Driver/passenger sunvisors with ticket holders + illuminated vanity mirrors
- English handbook
- Floor mats in velour
- Footwell lighting
- Front and rear door exit lights
- Front door storage bins with bottle holder
- Front interior light
- Front isofix attachment + airbag deactivation
- Front reading light
- Front seat backrest width adjustment
- Front seats lumbar support
- Front/rear door armrests
- Gearshift lever with embossed M badge
- Heated front seats
- Illumination in armrest storage compartment
- Interior mirror lighting
- Lockable/illuminated glovebox
- Luggage compartment lighting
- Multifunction steering wheel
- Rake/reach adjustable steering wheel
- Storage compartment in rear doors
- Storage tray and compartment with cover in centre console
- Three zone automatic air conditioning
- Toolkit located in luggage compartment
- 2 rear head restraints
- Electric front seats + driver memory
- Height adjustable front headrests
- Isofix on 2nd row outer seats
- Single front passenger seat
- Additional storage compartment pack - M4
- Connected package professional - M4
- High gloss shadowline exterior trim pack - M4
- 4 x 3 point seatbelts
- ABS/EBD
- Automatic Stability Control (ASC)
- Brake energy regeneration
- Brake fade compensation
- Compound structure brake discs
- CBC - (Cornering brake control)
- Crash sensor
- Curtain airbags
- Digital key
- Driver/Front Passenger airbags
- Dry braking
- Dynamic brake control
- Dynamic stability control + (DSC+)
- Dynamic Traction Control - DTC
- Electromechanical parking brake
- Electronic differential lock control (EDLC)
- Front and rear head airbags
- Front seat side impact airbags
- Front seatbelt pretensioners + load limiters
- Hill start assist
- M Sport seat belts
- Seat occupancy detection for driver and passenger side
- Seatbelt warning
- Side impact protection
- Two tone horn
- Tyre pressure sensor
- Warning triangle and first aid kit
- Centre lock switch
- Closing system with central locking
- Electronic immobiliser
- Remote central locking
- Thatcham cat 1 remote alarm
- Vehicle Key with 4 buttons including the integrated key
- Galvanic finish to control surrounds
- High gloss black interior trim
- Tyre repair kit
Tech specification
Vehicle Options
£28,650 savings from new
Fitted optional extras
- BMW Individual Paintwork£1,100Customised paint
- Parking Assistant Plus£650360 view camera, Front, rear and side radar & camera-type parking distance sensors
- 19"/20" Orbit Grey Matt 825 M Double-spoke forged alloy wheels with mixed tyres£300Front wheels: 19 inch two-tone alloy rims ; width: 9.5 inches, rear wheels: 20 inch two-tone alloy rims ; width: 10.5 inches, Front tyres: 19 inch diameter, 275mm wide, 35% profile, Y rated, rear tyres: 20 inch diameter, 285mm wide, 30% profile, Y rated
- Extended Merino leather upholstery£300Seat upholstery: leather and leather
Finance calculator
Saxton Car Care
Why buy from Saxton?

Quality Assured
Not only are our cars thoroughly checked and reconditioned, but each one has had a recent service and MOT (if required)
More Information

Budget Friendly Finance
We're able to offer a full range of finance options and bespoke packages tailored to suit your budget
View Finance Options

Car Care
Every car comes with a free RAC warranty and RAC roadside assistance, with options available up to 5 years.
View full Care Packages
Recently Viewed


