
Overview
ID: 18092
M4 Competition M xDrive Coupe
20" ALLOYS M DOUBLE SPOKE ALLOYS IN BLACK, HARMAN /KARDON, PRIVACY, DIGITAL COCKPIT, RED CALIPERS
Skyscraper Grey with Full Black Leather Interior Trim
The fuel consumption and CO2 emission figures shown above are measured at the point the vehicle was new. Figures are intended for comparability purposes. The fuel consumption you achieve under real life driving conditions and CO2 produced will depend upon a number of factors including the accessories fitted after registration, variations in driving styles, weather conditions, vehicle age and vehicle load.
The fuel consumption and CO2 emission figures shown above are measured at the point the vehicle was new. Figures are intended for comparability purposes. The fuel consumption you achieve under real life driving conditions and CO2 produced will depend upon a number of factors including the accessories fitted after registration, variations in driving styles, weather conditions, vehicle age and vehicle load.
Standard specification
Sorry, there is no standard specification available for this vehicle right now.Tech specification
Sorry, there is no technical specification available for this vehicle right now.Vehicle Options
Fitted optional extras
£24,780 savings from new
- 19"/20" Jet Black 826 M Double-spoke forged alloy wheels with mixed tyres£330Front wheels: 19 inch two-tone alloy rims ; width: 9.5 inches, rear wheels: 20 inch two-tone alloy rims ; width: 10.5 inches, Front tyres: 19 inch diameter, 275mm wide, 35% profile, Y rated, rear tyres: 20 inch diameter, 285mm wide, 30% profile, Y rated
Finance calculator
Saxton Car Care
Why buy from Saxton?

Quality Assured
Not only are our cars thoroughly checked and reconditioned, but each one has had a recent service and MOT (if required)
More Information

Budget Friendly Finance
We're able to offer a full range of finance options and bespoke packages tailored to suit your budget
View Finance Options

Car Care
Every car comes with a free RAC warranty and RAC roadside assistance, with options available up to 5 years.
View full Care Packages
Recently Viewed


