
Overview
ID: 17961
M3 Competition M xDrive Touring
20S, HUD, HARMAN KARDON, VISIBILITY PACK, TECH PLUS PACK, PRIVACY
Frozen deep grey with black Leather Interior
The fuel consumption and CO2 emission figures shown above are measured at the point the vehicle was new. Figures are intended for comparability purposes. The fuel consumption you achieve under real life driving conditions and CO2 produced will depend upon a number of factors including the accessories fitted after registration, variations in driving styles, weather conditions, vehicle age and vehicle load.
The fuel consumption and CO2 emission figures shown above are measured at the point the vehicle was new. Figures are intended for comparability purposes. The fuel consumption you achieve under real life driving conditions and CO2 produced will depend upon a number of factors including the accessories fitted after registration, variations in driving styles, weather conditions, vehicle age and vehicle load.
Standard specification
- Active guard plus
- Automatic start/stop system
- Bluetooth functionality with Apple CarPlay/Android Auto
- BMW ConnectedDrive online services
- BMW legal emergency call
- BMW Live Cockpit Professional sat nav system with 12.3" instrument display and high resolution control display
- BMW Online services
- BMW Teleservices
- Brake pad wear indicator warning light
- Condition based service
- Door/boot open warning light
- Driving experience switch
- Electric boot lid
- Head up Display
- iDrive controller on centre console
- Illuminated control elements
- Instrument cluster with extended contents
- Lights on warning
- M drive buttons
- Oil sensor for level and grade, warning by check control system
- Oil temperature gauge
- On board computer
- On board diagnostics
- Optimum shift indicator
- Outside temperature display
- Pull away assistant
- Run flat indicator
- Service interval indicator
- Shifting point display
- Speed limiter
- Variable sport steering
- Adaptive M Sport suspension
- Double joint spring strut front axle
- M Drive Professional including track mode, laptimer, traction control & Drift analyser
- M Sport differential
- M steptronic sport transmission with drivelogic
- Safety battery terminal clamp
- 8 programmable favourite buttons
- Auxiliary point for auxiliary devices
- DAB Digital radio
- Harman/Kardon loudspeaker system
- Personal eSim
- Wireless charging tray
- 3rd brake light
- Dynamic brake lights
- Follow me home headlights
- High beam assistant
- Welcome lighting
- Acoustic glazing
- Auto dimming driver's door mirror
- Automatic headlights + automatic windscreen wipers
- Automatic parking function on front passenger's exterior mirror
- Black model designation badges
- BMW emblem on engine compartment lid and tailgate
- BMW high gloss shadow line with extended contents
- BMW Individual shadowline lights
- Body colour bumpers
- Carbon fibre reinforced plastic (CFRP) roof with high gloss black roof aerial bulge and roof mouldings
- Day running lights
- Door sill finishers with aluminium inserts
- Electric front and rear windows with one touch/convenient open/close function
- Front and rear apron plastic in body colour
- Front and rear bumper system
- Headlight beam throw control
- Heat protection, sun protection glazing
- Heated rear window with automatic switch off
- Heated washer jets
- High gloss black frameless kidney grille with M badge
- High gloss black lower bumper edges, side sills and diffuser edge binding
- High gloss black M roof rails
- Illuminated bow type door handles in body colour drivers side with door lock
- LED number plate light
- LED tail lights with 3D L-shaped LED light design
- M designation
- M Sport entry door sill strips
- Mirror glass aspheric on driver's side, convex on passenger side
- Rear fog lights
- Rear reflectors
- Rear right M3 competition inscription
- Rear side wing doors
- Rear wiper
- Reversing light
- Shark fin roof aerial
- Strakes in front side panel, black matt/black high-gloss, with model badge
- Visible VIN plate
- Auto dimming rear view mirror
- Door mirror integrated indicators
- Electric adjustable heated door mirrors
- Electric folding door mirrors
- 2 front cupholder in centre console with clamping elements and matt black inlay
- 2 x 12 V Power sockets (luggage compartment and front centre console)
- 2 x USB Type C ports for charging and data transmission in front centre console
- 3 folding rear headrests
- Ambient door handle light
- Ambient lighting for instrument panel
- Ambient lighting for storage compartment
- Ambient lighting front and rear
- Ambient lighting in door panels
- Anthracite headlining
- Battery in luggage compartment
- Carbon fibre centre console incl. cover for cupholders and storage compartment
- Carbon fibre decorative steering wheel finishers
- Carbon fibre shift paddles
- Carbon fibre strip in instrument panel on front passenger side
- Centre console armrest with storage compartment
- Compartment in front of cupholder
- Driver/passenger sunvisors with illuminated vanity mirrors + covers
- Dynamic ambient interior lighting
- English handbook
- Floor mats in velour
- Folding rear centre armrest with 2 cupholders
- Front door storage bins with bottle holder
- Front isofix attachment + airbag deactivation
- Front seat backrest width adjustment
- Front seats lumbar support
- Front/rear door armrests
- Gearshift lever with embossed M badge
- Heated front seats
- Lockable/illuminated glovebox
- Luggage compartment lighting
- Manual 40:20:40 split folding rear seat with two tilt positions for backrest
- Multifunction steering wheel
- Rake/reach adjustable steering wheel
- Storage compartment in rear doors
- Three zone automatic air conditioning
- Through loading system
- Toolkit located in luggage compartment
- 3 seat bench in 2nd row
- Electric front seats + driver memory
- Height adjustable front headrests
- Isofix on 2nd row outer seats
- Single front passenger seat
- Additional storage compartment pack - M3
- Connected package professional - M3
- High gloss shadowline exterior trim pack - M3
- 3 point seatbelts on all seats
- Anti-lock braking system (ABS)
- Automatic Stability Control (ASC)
- Brake energy regeneration
- Brake fade compensation
- Compound structure brake discs
- CBC - (Cornering brake control)
- Crash sensor
- Driver/Front Passenger airbags
- Dry braking
- Dynamic brake control
- Dynamic stability control + (DSC+)
- Dynamic Traction Control - DTC
- Electromechanical parking brake
- Electronic differential lock control (EDLC)
- Front and rear head airbags
- Front seat side impact airbags
- Front seatbelt pretensioners + load limiters
- Hill start assist
- M Sport seat belts
- Rear child proof door locks
- Seat occupancy detection for driver and passenger side
- Seatbelt warning
- Side impact protection
- Two tone horn
- Tyre pressure sensor
- Warning triangle and first aid kit
- Digital key
- Centre lock switch
- Closing system with central locking
- Electronic immobiliser
- Thatcham cat 1 remote alarm
- Vehicle Key with 4 buttons including the integrated key
- Galvanic finish to control surrounds
- High gloss black interior trim
- Tyre repair kit
Tech specification
Finance calculator
Saxton Car Care
Why buy from Saxton?

Quality Assured
Not only are our cars thoroughly checked and reconditioned, but each one has had a recent service and MOT (if required)
More Information

Budget Friendly Finance
We're able to offer a full range of finance options and bespoke packages tailored to suit your budget
View Finance Options

Car Care
Every car comes with a free RAC warranty and RAC roadside assistance, with options available up to 5 years.
View full Care Packages
Recently Viewed


