
Overview
The fuel consumption and CO2 emission figures shown above are measured at the point the vehicle was new. Figures are intended for comparability purposes. The fuel consumption you achieve under real life driving conditions and CO2 produced will depend upon a number of factors including the accessories fitted after registration, variations in driving styles, weather conditions, vehicle age and vehicle load.
The fuel consumption and CO2 emission figures shown above are measured at the point the vehicle was new. Figures are intended for comparability purposes. The fuel consumption you achieve under real life driving conditions and CO2 produced will depend upon a number of factors including the accessories fitted after registration, variations in driving styles, weather conditions, vehicle age and vehicle load.
ID: 17776
M2 Competition
19" M Y-SPOKE ALLOYS, UPGRADED M2 COMPEITION BRAKING SYSTEM, NITRON SHOCK COILOVERS
Hockenheim silver metallic with Black Leather Interior
This vehicle's specification has been provided by industry leading data suppliers CAP HPI and Autotrader, which provides vehicle data across the whole of the market. However, we cannot guarantee the accuracy of any data provided by 3rd Party sources as the specification can sometimes vary. Please check with a salesperson and ensure you physically inspect the vehicle in respect of any items which may affect your decision to purchase.
Standard specification
- Apple CarPlay preparation
- Auto start-stop
- BMW ConnectedDrive
- BMW Online services
- BMW remote services
- BMW Teleservices
- Cruise control with braking function
- Door/boot open warning
- Front and rear Brake pad wear indicator
- Front/rear Parking distance control
- Instrument cluster with speedometer with miles per hour read out, tachometer and fuel gauge
- Lights on warning by audio warning signal when ignition is switched off
- M drive manager with three steering modes and three drive modes
- M Servotronic power steering
- M specific Start/stop button finishes in red
- Oil temperature display via on board computer in instrument cluster
- On board computer - average speed+fuel consumption, service interval, clock/date, odometer/trip meter, outside temperature display and ice warning
- Optimum shift indicator
- Personal Profile - automatic lock when driving away selectable
- Professional multimedia navigation system
- Real time traffic information
- Speed limiting function
- Traffic message channel (TMC)
- Aluminium lightweight construction including crankcase
- Battery age recognition function
- Double VANOS
- Drive performance control - ECO PRO, comfort, sport and sport+ modes
- Engine cover with BMW roundel twin power turbo designation
- High precision direct injection
- M sport suspension
- Oil dipstick
- VALVETRONIC engine management
- DAB Digital radio
- Online entertainment
- 2 speed adjustable intermittent wipers with wash/wipe function
- Air intake in gloss black
- Automatic headlight beam throw control
- Automatically dimming rear view mirror
- Black optic display instrument cluster with M specific display red needles and M2 competition welcome screen
- Body colour door handles
- Body colour front bumper
- Body colour mirror caps
- Body colour roof mouldings
- Darkened rear lights with LED light bars
- Daytime driving lights
- Door sill finishers with M2 competition designation
- Electric windows - front and rear, with open/close fingertip control, anti-trap facility and comfort closing
- Electrically adjustable and heated M specific exterior mirrors
- Exterior mirrors - electrically folding with anti-dazzle
- Front air inlet with high gloss black finish
- Front and rear bumper system with replaceable deformation elements
- Green tinted heat protection glazing
- Headlight range control
- Heated windscreen washer jets
- High gloss black kidney grille with M double rod vertical slats and M2 badging
- High gloss black M side strakes with M2 designation
- High gloss shadow line with extended contents
- LED welcome home lights
- M aerodynamic body styling with airblades in Cerium grey
- M rear spoiler
- M2 competition model designation on boot
- M2 specific aerodynamic body styling with unique kidney grille, front bumper, rear bumper and side skirts
- Model designation
- Rain sensor with automatic headlight activation
- Rear bumper with high gloss black finish
- Rear fog lights
- Rear window aerial
- Shark fin roof aerial
- Twin dark chrome exhaust tailpipes with bevelled design
- Visible VIN plate
- Clear lenses direction indicator lights
- Direction indicator side lights integrated exterior mirrors
- Dynamic brake lights
- Follow me home headlights
- High level third brake light
- Reversing light in rear light cluster
- 12V power socket in centre console
- 12V power socket in passenger footwell
- Anthracite Velour floor mats
- Conditioned based service
- Dakota leather upholstery
- Driver and front passenger seat heating
- Front and rear side armrests integrated into door trim
- Front door storage bins
- Front M Sport seats
- Front sliding armrest
- Full black panel display
- Glove box handle with chrome surround
- Interior lighting, front centre over interior mirror and rear centre automatic interior light activation when door is opened
- Isofix child seat for two outer rear seats
- Leather gearknob
- Leather handbrake lever
- Luggage compartment access via BMW roundel
- Manually adjustment steering wheel column
- Multi-function controls for steering wheel
- Rear coat hooks
- Rear folding head restraints
- Storage compartment in rear centre console
- Three spoke design M leather steering wheel with three colour M stitching and M1/M2 programmable buttons
- Two cupholders with sliding cover and inlay mat
- Automatic two zone climate control air conditioning
- Front head restraints
- Extended lighting pack - 2 Series
- Extended storage pack - 2 Series
- 2 rear 3 point safety belts
- Active M differential - electronically controlled multi-disc clutch, optimal traction, optimised power transfer even when DSC off and M dynamic mode
- Airbag - Front driver and passenger, front and rear head, front side, curtain head protection, manual deactivation of front passenger airbag possible
- Anti lock braking system (ABS) with brake assist
- Automatic Stability Control (ASC)
- BMW emergency call
- Brake drying
- Brake energy regeneration
- Braking readiness
- CBC - (Cornering brake control)
- Crash sensor activating central locking release with hazard warning lights and interior lighting + battery safety cut-off
- Dynamic brake control
- Dynamic stability control + (DSC+)
- Dynamic Traction Control - DTC
- Front pyrotechnic belt tensioners and belt force limiter, rear coaded belt buckles
- Hill start assist
- M specific braking system drilled compound structure discs with internal ventilation
- M sport seatbelt
- Rear brake discs
- Seat belt security check for driver and front passenger
- Side impact protection
- Twin horns
- Tyre pressure monitoring with 3 level warning strategy
- Ventilated front disc brakes
- Warning triangle and first aid kit
- Central locking switch for all doors, fuel filler cap and luggage compartment
- Check control system for monitoring of lights and door/luggage compartment open warning
- Locking wheel bolts
- Remote control including integrated key with blue insert
- Start/stop button with Comfort Go keyless engine start and auto Start/stop deactivation button
- Thatcham category 1 alarm + immobiliser
- Carbon fibre interior trim with black high gloss finish
- BMW mobility system
- Reduced rolling resistance tyres
This vehicle's specification has been provided by industry leading data suppliers CAP HPI and Autotrader, which provides vehicle data across the whole of the market. However, we cannot guarantee the accuracy of any data provided by 3rd Party sources as the specification can sometimes vary. Please check with a salesperson and ensure you physically inspect the vehicle in respect of any items which may affect your decision to purchase.
Tech specification
This vehicle's specification has been provided by industry leading data suppliers CAP HPI and Autotrader, which provides vehicle data across the whole of the market. However, we cannot guarantee the accuracy of any data provided by 3rd Party sources as the specification can sometimes vary. Please check with a salesperson and ensure you physically inspect the vehicle in respect of any items which may affect your decision to purchase.
Vehicle Options
£20,675 savings from new
Fitted optional extras
- M DCT Gearbox£2,645Transmission: 7-speed, paddle-shift dual clutch manual sequentional with automatic mode featuring gear lever mounted on the steering wheel, Dual clutch sequentialgearbox, Fuel consumption: 10.5 l/100km (urban), 6.4 l/100km (country/highway), 7.9 l/100km (combined), 22 mpg (urban US), 37 mpg (country/highway US), 30 mpg (combined US), 27 mpg (urban UK), 44 mpg (country/highway UK), 36 mpg (combined UK), ; Standard: ECE 99/100, Performance: maximum speed 155 mph, 250 km/h acceleration 4.3 seconds (0-100 km/h), Emissions: 185 g/km CO2 (max), Traffic light coding: efficiency label E, Weights: Kerb weight (kg): 1,595 and Kerb weight (lbs): 3,516
- Upgraded M2 Competition braking system£1,350Upgraded M2 Competition braking system, Four disc brakes including four ventilated discs painted callipers
- Seat heating for driver and front passenger£295Driver and passenger seat: heated
- M Seat belts£260
- Lumbar support, driver and front passenger£195Driver and passenger seat: adjustable lumbar support
This vehicle's specification has been provided by industry leading data suppliers CAP HPI and Autotrader, which provides vehicle data across the whole of the market. However, we cannot guarantee the accuracy of any data provided by 3rd Party sources as the specification can sometimes vary. Please check with a salesperson and ensure you physically inspect the vehicle in respect of any items which may affect your decision to purchase.
Your Savings
£20,675 savings from new
Finance calculator
Saxton Car Care
Why buy from Saxton?

Quality Assured
Not only are our cars thoroughly checked and reconditioned, but each one has had a recent service and MOT (if required)
More Information

Budget Friendly Finance
We're able to offer a full range of finance options and bespoke packages tailored to suit your budget
View Finance Options

Car Care
Every car comes with a free RAC warranty and RAC roadside assistance, with options available up to 5 years.
View full Care Packages
You may also like
Recently Viewed


