BMW M2 Sticky Header Image
BMW M2
3.0 BiTurbo Euro 6 (s/s) 2dr
WL73ABK
11,200 miles
£46,000
LP £452 month
Enquire now
Click & collect
Reserve online and collect in store
Reserve & test drive
Visit our showroom today
UK nationwide delivery
Available on all cars
BMW M2 Image 1BMW M2 Image 2BMW M2 Image 3BMW M2 Image 4BMW M2 Image 5BMW M2 Image 6BMW M2 Image 7BMW M2 Image 8BMW M2 Image 9BMW M2 Image 10BMW M2 Image 11BMW M2 Image 12BMW M2 Image 13BMW M2 Image 14BMW M2 Image 15BMW M2 Image 16BMW M2 Image 17BMW M2 Image 18BMW M2 Image 19BMW M2 Image 20BMW M2 Image 21BMW M2 Image 22BMW M2 Image 23BMW M2 Image 24BMW M2 Image 25BMW M2 Image 26BMW M2 Image 27BMW M2 Image 28BMW M2 Image 29

Overview

ID: 14861

3.0 BiTurbo Euro 6 (s/s) 2dr

19s, HARMAN / KARDON, HEAD UP DISPLAY, RED CALIPERS, PRIVACY GLASS

Toronto Red with Black Leather Interior

This car benefits from the following features: Carbon Fibre Roof, Sun protection glazing, Auto Dip Exterior Mirrors, Lumbar Support on Front Seats, Parking Assist. The interior features of this car are: Steering Wheel Heater, Electric adjustable seats with memory, Heated Driver/Passenger Seats, M Seat Belts, Anthracite Black Headlining. The technology and systems that this car has are as follows: Automatic Air Conditioning, DAB Tuner, Harman/Kardon surround sound system, Teleservices, Active pedestrian protection. The BMW M2 is a stylish, fast and premium Coupe boasting all the power a BMW Motorsport Car can offer.
Year
2023
Reg
WL73ABK
Mileage
11,200
Colour
Toronto Red
Body type
Coupe
Transmission
Manual
Fuel type
Petrol
Engine size
2993 cc
Doors
2
Seats
4
MPG

The fuel consumption and CO2 emission figures shown above are measured at the point the vehicle was new. Figures are intended for comparability purposes. The fuel consumption you achieve under real life driving conditions and CO2 produced will depend upon a number of factors including the accessories fitted after registration, variations in driving styles, weather conditions, vehicle age and vehicle load.

29.10
Emissions

The fuel consumption and CO2 emission figures shown above are measured at the point the vehicle was new. Figures are intended for comparability purposes. The fuel consumption you achieve under real life driving conditions and CO2 produced will depend upon a number of factors including the accessories fitted after registration, variations in driving styles, weather conditions, vehicle age and vehicle load.

228.00 G/KM

Standard specification

  • BMW ConnectedDrive online services
  • BMW legal emergency call
  • BMW Teleservices
  • Check control system
  • Configurable dashboard display
  • Cruise control with braking function
  • Digital owner's manual
  • Drive off assistant
  • Driver attention warning
  • Engine start button
  • Exterior temperature display
  • Live Cockpit Pro with head up display including 12.3" instrument cluster and 14.9" central display
  • M drive: DSC mode, engine characteristics, M Servotronic, M Drivelogic, adaptive M suspension, brake characteristics, M Sound Control
  • Oil sensor for level and grade
  • On board diagnostics
  • Parking assistant with reversing assistant, active PDC, lateral parking aid and rear view camera
  • PAS
  • Service interval indicator
  • Speed limiter
  • Start/stop system
  • Travel data recorder
  • Trip computer
  • Voice control for audio, climate, telephone, navigation
  • Widescreen display
  • M Adaptive suspension
  • M Drive Professional including track mode, laptimer, traction control & Drift analyser
  • M Sport differential
  • DAB tuner
  • Harman/Kardon surround sound system
  • USB port
  • Adaptive LED Headlights
  • Automatic headlamp activation
  • Automatic headlamp levelling
  • Dynamic brake lights
  • Follow me home headlights
  • High beam assistant
  • LED indicator lights
  • LED rear lights
  • Welcome lighting
  • BMW Individual shadowline lights
  • Extended High-gloss shadowline exterior trim: high-gloss black mirror caps and rear spoiler, tailpipe finishers in black chrome
  • Fading support
  • Front and rear bumper system
  • Front electric windows
  • Headlight beam throw control
  • Heat protection, sun protection glazing
  • Illuminated M highlighters
  • Interior rear view electrochromatic mirror with automatic anti dazzle function
  • LED 3rd brake light
  • LED daytime running lights
  • LED number plate light
  • M carbon fibre roof
  • M high gloss shadowline exterior trim in mirror triangle cover, mirror cover panel, mirror bezel and window border
  • Mirror glass aspheric on driver's side, convex on passenger side
  • Rain sensor
  • Rear boot
  • Sun protection glass: darkened glass for rear screen and rear side windows
  • Variable front intermittent wipers
  • Door mirror integrated indicators
  • Electric adjustable heated door mirrors
  • 12V power socket in front centre console with blanking plug
  • 2 cupholders
  • 2 rear seats
  • 3 spoke leather M multi-function steering wheel
  • Ambient lighting
  • Black velour front and rear floor mats
  • Carbon fibre interior trim including carbon applications on the steering wheel
  • Compartment in front of cupholder
  • Driver/passenger electric lumbar adjustment
  • Electrically adjustable front seats - driver seat with memory
  • Folding rear seat head rests
  • Front and rear door exit lights
  • Front and rear footwell lights
  • Front centre armrest
  • Front door pockets with bottle holders
  • Front door sill strips with aluminium inlays and M2 labelling
  • Front interior light
  • Front M Sport seats
  • Front reading lights
  • Glove compartment
  • Glovebox light
  • Heated front seats
  • Illuminated armrest storage compartment
  • Illuminated M accents in front door
  • Isofix child seat for two outer rear seats
  • Luggage compartment lighting
  • M Anthracite headlining
  • Manually adjustable steering column
  • Rear armrest
  • Steering column rake adjustment
  • Storage compartment in rear doors
  • Storage tray and compartment with cover in centre console
  • Through loading system with 40/20/40 split folding rear seat
  • Two zone automatic air conditioning
  • Vanity mirror lights
  • 2 rear head restraints
  • Height adjustable front headrests
  • Single front passenger seat
  • Connected package professional - M2
  • Extended storage pack - M2
  • Interior and exterior mirror pack - M2
  • 4 x 3 point seatbelts
  • ABS/EBD
  • Automatic Stability Control (ASC)
  • CBC - (Cornering brake control)
  • Crash sensor
  • Curtain airbags
  • Driver/Front Passenger airbags
  • Dry braking
  • DSC - Dynamic Stability Control
  • Dynamic brake control
  • Electromechanical parking brake
  • Emergency door unlock
  • Front passenger airbag deactivation
  • Height adjustable front seatbelts
  • M seat belts
  • Seatbelt load limiter
  • Seatbelt pretensioners with load limiters
  • Seatbelt reminder
  • Tyre pressure sensor
  • Alarm system
  • Central locking
  • Drive away door locking
  • Immobiliser
  • Remote central locking
  • Tyre repair kit
This vehicle's specification has been provided by the leading data supplier CAP HPI, which provides vehicle data across the whole of the industry. However, we cannot guarantee the accuracy of any data provided by 3rd Party sources as the specification can sometimes vary. Please check with a salesperson and ensure you physically inspect the vehicle in respect of any items which may affect your decision to purchase.

Tech specification

CO0.18
HC0.006
HC+NOxNot Available
NOx0.014
Particles0.0002
Standard Euro EmissionsEURO 6
WLTP - CO2 (g/km) - Comb228
WLTP - CO2 (g/km) - Comb - TEH228
WLTP - CO2 (g/km) - Comb - TEL227
WLTP - CO2 (g/km) - Extra High206
WLTP - CO2 (g/km) - High188
WLTP - CO2 (g/km) - Low335
WLTP - CO2 (g/km) - Medium218
CamshaftDOHC
Catalytic ConvertorYes
CC2993
Compression Ratio9.3:1
Cylinder LayoutIN-LINE
Cylinders6
Cylinders - Bore (mm)84
Cylinders - Stroke (mm)90
Engine CodeS58B30T0
Engine LayoutNORTH SOUTH
Fuel DeliveryTWIN TURBO
Gears6 SPEED
Number of Valves24
TransmissionMANUAL
EC Directive 1999/100/EC AppliesNo
WLTP - FC (l/100km) - Comb10
WLTP - FC (l/100km) - Comb - TEH10.1
WLTP - FC (l/100km) - Comb - TEL10
WLTP - FC (l/100km) - Extra High9.1
WLTP - FC (l/100km) - High8.3
WLTP - FC (l/100km) - Low14.8
WLTP - FC (l/100km) - Medium9.7
WLTP - MPG - Comb28.2
WLTP - MPG - Comb - TEH28
WLTP - MPG - Comb - TEL28.2
WLTP - MPG - Extra High31
WLTP - MPG - High34
WLTP - MPG - Low19.1
WLTP - MPG - Medium29.1
Alternative Fuel QualifyingNo
Badge Engine CC3.0
Badge Power460
Based On IDNot Available
Coin DescriptionNot Available
Coin SeriesM2
Generation Mark2
Insurance Group 1 - 50 Effective January 0742E
NCAP Adult Occupant Protection %Not Available
NCAP Child Occupant Protection %Not Available
NCAP Overall Rating - Effective February 09Not Available
NCAP Pedestrian Protection %Not Available
NCAP Safety Assist %Not Available
Did at least one aspect of this vehicle's safety give cause for concern?No
Special EditionNo
Special OrderNo
Standard manufacturers warranty - MileageUnlimited
Standard manufacturers warranty - Years3
Vehicle Homologation ClassM1
0 to 62 mph (secs)4.3
Engine Power - BHP460
Engine Power - KW338
Engine Power - RPM6250
Engine Torque - LBS.FT406
Engine Torque - MKG56.1
Engine Torque - NM550
Engine Torque - RPM2650
Top Speed155
Emissions Test CycleWLTP
RDE Certification LevelRDE 2
Alloys?Yes
Space Saver?No
Tyre Size Front275/35 R19
Tyre Size Rear285/30 R20
Tyre Size SpareTYRE REPAIR KIT
Wheel StyleDOUBLE SPOKE - 930M
Wheel Type20" ALLOY
Height1403
Height (including roof rails)Not Available
Length4580
Wheelbase2747
Width1887
Width (including mirrors)2068
Fuel Tank Capacity (Litres)52
Gross Vehicle Weight2155
Luggage Capacity (Seats Down)Not Available
Luggage Capacity (Seats Up)390
Max. Loading Weight455
Max. Roof Load75
Max. Towing Weight - BrakedNot Available
Max. Towing Weight - UnbrakedNot Available
Minimum Kerbweight1700
No. of Seats4
Turning Circle - Kerb to Kerb11.9
This vehicle's specification has been provided by the leading data supplier CAP HPI, which provides vehicle data across the whole of the industry. However, we cannot guarantee the accuracy of any data provided by 3rd Party sources as the specification can sometimes vary. Please check with a salesperson and ensure you physically inspect the vehicle in respect of any items which may affect your decision to purchase.

2023 BMW M2
3.0 BiTurbo Euro 6 (s/s) 2dr

19s, HARMAN / KARDON, HEAD UP DISPLAY, RED CALIPERS, PRIVACY GLASS
Toronto Red with Black Leather Interior
Pay monthly
£452
Pay in full
£46,000
+Admin Fee

A variable administration fee is charged depending on your circumstances.

  • Repeat retail customers purchasing within 12 months FREE
  • Repeat retail customer purchasing within a 13-24 month period £199
  • Retail Customer £299
  • Export Sale £995 (Plus VAT) (In addition to fees above)

For full retail terms and conditions please click here

  • Trade Sale to the motoring trade or Export Sale the Fee is £995 (Plus VAT)

For full trade terms and conditions please click here

Save £2,500
View finance options
Reserve for £500
Deposit fully refundable
Book a test drive Request personalised video Make enquiry

Book a test drive

BMW M2
  • Save £2,500

BMW M2

2023, 3.0 BiTurbo Euro 6 (s/s) 2dr
£46,000 or £452 per month
Standard booking fee: Free
Secure booking fee: £500.00
  • Instantly book

    Select a suitable date and time to inspect and test drive this vehicle at your leisure.

  • Peace of mind

    All of our cars have gone through a 200 + multi point vehicle inspection and vehicle provenance check for peace of mind

  • No obligation

    There’s no obligation to go ahead. No ifs, no buts. Just come for a visit and we know we'll wow you

  • Not secured

    This does not stop another customer from snapping this car before you get the chance. Want to secure it? Click the secure booking button below and secure it for with a fully refundable £99 deposit

By submitting this form I agree to the terms of our Privacy Policy
Standard test drive
Booking a test drive does not stop another customer from snapping up this car before you get a chance. Want to make sure you don't lose out? Click the 'Secure Booking' button below and secure it with fully refundable £500 deposit.
Secure booking £500
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

BMW M2

Request personalised video
By submitting this form I agree to the terms of our Privacy Policy
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

BMW M2

Get in touch
By submitting this form I agree to the terms of our Privacy Policy
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.
Have a part-exchange?
Instant Credit Check
Check now
Print advert
Protect your car with Saxton Car Care
View more

Finance calculator

Why buy from Saxton?

Quality Assured Icon

Quality Assured

Not only are our cars thoroughly checked and reconditioned, but each one has had a recent service and MOT (if required)

More Information

Budget Friendly Finance Icon

Budget Friendly Finance

We're able to offer a full range of finance options and bespoke packages tailored to suit your budget

View Finance Options

Car Care Icon

Car Care

Every car comes with a free RAC warranty and RAC roadside assistance, with options available up to 5 years. 

View full Care Packages

Card Icon Saxton Car Care

Learn about our protection packages

Recently Viewed

4.1 (2,000+ reviews)
4.6 (3,000+ reviews)
4 (210+ reviews)